We got the photos from Tomas Rakovic, from the constructions company TR-Walls. The route setters came today and have begun to build the routes.
Technical data:
Height of the wall: 16 m
Width of the wall: 16 m
Maximal overhang: 8,9 m
Overall surface: 248 m2
Number of climbing lines: 6
Time of wall construction: 6 days
Construction: Combination of scaffolfd and timber construction
Surface: plywood and plastic panels TR compact
Holds: AIX, TR-walls
Photos from Monday, November 2nd, 2009:
The photos are from the end of the last week: